Hydraulic cylinder precautions

First, in order to prevent the bending or deformation of the elongated member such as the piston rod, the balance of the support is applied when placed. During the disassembly, the piston rod top thread, the port thread and the piston rod surface, the inner wall of the cylinder liner, etc. should be prevented from being damaged.

Second, the disassembly should be carried out in order. Due to the different structure and size of the various hydraulic cylinders, the disassembly sequence is slightly different. Generally, the oil in the two chambers of the cylinder should be drained, then the cylinder head should be removed, and the piston and piston rod should be removed. When disassembling the cylinder head of the hydraulic cylinder, special tools should be used for the key or the snap ring of the inner card type connection. It is forbidden to use the flat shovel; for the flange type end cover, it should be screwed out, no hammering or hard smashing is allowed. . When the piston and the piston rod are difficult to extract, do not force it out. You should first find out the cause and then disassemble it.

Third, before and after unloading, try to create conditions to prevent the parts of the hydraulic cylinder from being contaminated by dust and impurities around. For example, when disassembling, try to carry out in a clean environment; after disassembly, all parts should be covered with plastic cloth, not covered with cotton cloth or other work cloth.

Fourth, the cylinder should be carefully checked after disassembly to determine which parts can continue to be used, which parts can be repaired before use, and which parts should be replaced.

Fifth, carefully clean the parts before assembly.

Sixth, when the threaded coupling is tightened, a special wrench should be used, and the torque should meet the standard requirements.

Seventh, after assembling the piston and the piston rod, it is necessary to try to measure whether the concentricity and the straightness over the entire length are out of tolerance.

Eighth, after the assembly, the piston assembly should be moved without any obstruction and uneven resistance.

Ninth, when the hydraulic cylinder is installed on the main machine, a sealing ring should be added between the inlet and outlet port joints and fastened to prevent oil leakage.

2019/09/25 10:12:00 3927 次


Related Documents
Copy right ? 2019 Wuxi Chenna Machinery Co., Ltd.(Changzhou Chenna Hydraulic Machinery Co., Ltd.) All rights reserved.
少妇少洁第1一40章| 国产欧美日韩| 吴北唐紫怡小说免费阅读| 成人性做爰AAA片免费看曹查理| 国产suv精二区69| 国产精品美女久久久免费| 久久久久久久久波多野高潮| 国产香蕉九九久久精品免费| 老师含紧一点H边做边走视频动漫| 免费毛片在线看不用播放器 | 亚洲香蕉中文日韩V日本国产 | 熟女大屁股白浆一区二区| 老扒夜夜春宵伴娇熄法蓉| 少妇BBW搡BBBB搡BBBB| 极品尤物一区二区三区| 亚洲人成亚洲人成在线观看| 男人搡女人全部过程| 双性喂奶给室友八人攻| 88国产精品欧美一区二区三区| AV小四郎收藏家| 14表妺好紧没带套经过| 少妇一夜三次一区二区| 国产在线精品二区| 亚洲精品一区二区| 久久久噜噜噜久久中文字幕色伊伊| 老师黑色双开真丝旗袍| 国产精品久久久久久亚洲AV| 交换娇妻系列38部分阅读 | 99er热精品视频国产免费| 日本少妇裸体做爰高潮片| 亚洲AV无码专区国产乱码不卡| 中文精品无码中文字幕无码专区| 张栢芝全套94张未删图| 朋友的丰满人妻HD中文| 被主人惩罚在惩戒室SM| 国产白嫩护士被弄高潮| 久久国产精品99久久久久久| 农民人伦一区二区三区| 巴西FREE性VIDEO极品| 女朋友闺蜜奶好大下面好紧| 青青精品视频国产|